Manchester Downtown Enhancement in conjunction with the MDOT M-52 Project
The Michigan Department of Transportation M-52 project through the Village starts March 26, 2012 and continues through November. The schedule for the Downtown Enhancement portion of this project is not yet finalized. Pictorial design graphics, engineering drawings, and specifications are shown in the following links:- Downtown Streetscape Graphic
- Downtown Streetscape Drawings
- Design Specifications
- Downtown Tree Detail
- Downtown Tree Grate
Detail
- Amenity Details
- Streetlighting Layout
- Streetlight Specifications
- MDOT
Construction Detour Brochure
Funding for the Downtown Enhancement is largely from the Federal Tranportation Enhancement program, supplemented by MDOT and local funding.